The Ensign sewage treatment plants are tested and CE marked to BSEN12566-3: The Environment Agency & UK Trading Standards will only allow the installation of sewage plants 6PE-50PE that have been tested to BSEN12566-3.
Has most recently been tested and certified to A1:2009
The Ensign will achieve an effluent quality of 12mg/litre BOD, 19mg/litre Suspended Solids and 9mg/litre Ammonia,which is significantly better than the UK standard and should be acceptable to be discharged directly into a watercourse.
The Ensign sewage treatment plant is covered by the following product guarantees:
Internal & External Structure - 25 years *
Compressor Blower - 2 years
Ceramic Diffuser - 5 years
Jung Pump - 2 years (for pumped outlets only).
(* installed to our Installation Manual instructions)
(* installed to our Installation Manual instructions)
The Ensign sewage treatment plants are now all fitted with compressor alarms as standard.
Normal inlet inverts are 500mm. Invert risers are available from 250mm to one metre as required.
Designed & tested to EN 12566-3:2005+A1:2009
The plant has low visual impact with unobtrusive lids.
In normal ground conditions the unit can be installed in peas shingle.
The Self Aligning Low Profile Means Faster Installation And Negligible Visual Impact
Low Running Costs est. at £52 for a Six Person
Easy Access Integral separate de-sludge pipe
Almost Silent Running & Odour Free
Manufactured In The United Kingdom & Is Backed With A 25 Year Structural Guarantee, which is one of the longest guarantee's on the market to date.
Invert Risers and Pumped Outlets Can Be Supplied For Deeper Drain Connections
Designed With Integral Recycling System That Makes It Ideal For Intermittent Use.
Approved For Discharging Into A Watercourse, Ditch Or Land Drainage Bed. Listed On The British Water Web Pages
Delivery is £99 anywhere In England & Wales, Please call us for a price on any other location
No comments:
Post a Comment